Wednesday, June 30, 2021

2021 Renovation Update #4 - Sprigging

Until the last two weeks the weather has been phenomenal for golf course construction. However, we knew it was inevitable that the Southwest Florida rainy season would arrive, and it has in full force!  

Even with Mother Nature not fully cooperating the project continues to progress as planned. The first six holes (3-8) and the practice green area have been grassed, Better Billy Bunkers on these holes are complete, numerous ancillary projects are finished and the grow-in of the sprigged areas is underway.  

Practice Green 6/26/21

Often when discussing the renovation project questions have arisen about the seeding of the golf course. The questions are understandable since when establishing cool season grasses (bentgrass, bluegrass, ryegrass, etc.) seed is a common planting method. 

In Florida, we use warm season grasses (primarily bermudagrass) on golf courses. Without getting too deep into plant genetics, it helps to understand that only common bermudagrass is viable from seed. Common bermudagrass is a 36 chromosome plant, and while there have been some improved common varieties, in our situation they were not an option. 

In analyzing our needs at Olde Florida it was decided that TifTuf, a hybrid bermudagrss was the best choice for our facilty. Hybrid bermudagrasses, like TifTuf were created to have improved golf and athletic field characteristics. In addition to TifTuf, examples of  hybrids include; TifWay, TifSport, TifEagle, TifGrand, Latitude 36, as well as many others. 

In laymen’s terms to create a hybrid bermudagrass a 36 chromosome plant (common bermudagrass) is crossed with an 18 chromosome plant (African bermudagrass) and what is produced is a plant that has improved attributes over each individually and is pollen and seed sterile. 

Note: That is an extremely simplistic explanation of hybrid bermudagrass plant breeding. 

If you are interested in a more detailed explanation on bermudagrass plant breeding you can click this link: "Dedicated plant breeders have worked for decades to improve common bermudagrass cultivars to provide finer, high quality turf."

Now that the plant genetic stuff is out of the way, let's talk "sprigging"!   

Since hybrid bermudagrasses (like TifTuf) are sterile they can't be planted by seed. They are planted "vegetatively."  This means they are established from sprigs or sod. One advantage of sprigging is it's much more cost effective than sodding. In fact, for every one acre of sod installed you could sprig 10 acres. When deciding how much, and where sprigs or sod should be used there are numerous factors, not just planting cost that must be considered

TifTuf Sprigs - 6/30/21

Sprigging is the process of removing stems (stolons or rhizomes) from a mature stand of turf and replanting the vegetative cuttings in a different location. All of our Certified TifTuf Bermudagrass sprigs (and sod) are harvested from Pike Creek Turf in Adel, GA. The turfgrass is harvested the day prior to the requested delivery date and transported overnight so planting can be begin at 7:00 a.m the day after harvest. This is very important! Successful establishment is highly dependent on the timing between obtaining, planting and watering.  

Sprig Delivery #2 Fairway - 6/22/21

Sprig Delivery #2 Fairway - 6/22/21

Sprigs are typically 3 to 6 inches long and contain numerous nodes (i.e. growing points) from which new roots and shoots develop. Site preparation is critical to provide good sprig to soil contact and enhance establishment rate. 

Our site preparation (after eradication of the existing turfgrass) included multiple vertical mowings, multiple aerifications at a 2" depth, sand top-dressing in wet areas and multiple circular passes with a UniRake to smooth the surface. 

Sprig/Soil Preparation (Aerification)

Sprig/Soil Preparation (Vertical Mowing) 

Sprig/Soil Preparation (UniRake

The final steps, which occur the morning of sprig installation  is an application of an all organic pre-plant fertilizer, a "float" to smooth the surface and an application of a pre-emergent herbicide. 

"Floating" 4 Fairway - 6/21/21

Pre-emergent Herbicide Application 6 Fairway - 6/24/21

Sprigs can be "hand planted" or "machine planted." Both methods are being utilized at Olde Florida. On our teeing surfaces, which have all been laser leveled to an exact 1% front to back slope, the surface is being hand planted and sliced in with a small tractor. The fairways and rough and being machine planted. Both methods broadcast the sprigs on the surface, followed by slicing/cutting in and rolling to smooth and seal the opening that was created in the soil. 

Machine Planting 4 Fairway - 6/22/21

Hand Planting 3 Tee - 6/22/21

"Slicing" in 3 Tee - 6/22/21

It's essential that sprigs receive adequate water for best results during establishment. Sprigs are watered within 30 minutes of planting and we irrigate to keep the soil persistently moist during establishment.  Sprigs must be watered generously during establishment because with  limited roots the plant is unable to reach water in the soil profile. All sprigged areas are lightly  irrigated throughout daylight hours for 7-10 days after planting.
 

Irrigation 4 Fairway - 6/22/21

The irrigation is a balance that requires continuous monitoring.  We need to irrigate frequently enough that the sprigged areas do not dry out, but we also need to make sure the irrigation cycles don’t create washing of the soil or over saturate the area. The root system of a sprig also requires oxygen to function. This is where the "art and science" of turfgrass management is put to the test. 

Irrigation is reduced gradually once the plants have established a root system and we see visible signs of growth. As the new turfgrass reaches 1-2" we will reduce irrigation during the day and move to a maintenance irrigation program of "deep and infrequent" nightly watering.


One Week Post-Planting 3 Tee - 6/29/21

Construction and surface preparation has now shifted to holes 11 - 16, which are the next six holes that will be grassed.
6/21/21




 




Sunday, June 13, 2021

2021 Renovation Update #3 - TifTuf Bermudagrass

It has been a very productive couple of weeks since my last update on the 2021 renovation. Things continue to progress on schedule and as planned!

The Better Billy Bunkers on holes 3 - 8 have all been constructed and the new sand is installed! They look great! Bunker construction has now moved to the next six holes, which are 11-16. 

Note:    My last renovation update, which focused on the Better Billy Bunker construction method can be found by clicking on the following link: "Bunker Renovation".

Polymer Application (right) on a Better Billy Bunker Hole 8 - 6/1/21

In this update I am excited to report that grassing of the golf course is underway! We are currently installing Certified TifTuf Bermudagrass on holes 3 - 8, and other than the teeing surfaces (which will be sprigged), holes 3 and 5 are completely grassed with our new turfgrass. 

Hole 3 - 6/12/21

In this entry I will focus on TifTuf and provide details on why we selected the variety. 

In addition to several years of on-site evaluation of TifTuf at Olde Florida, I made numerous course visits as well as consulted with agronomists and university researchers prior to making the selection. 


The "1" tee on Hole 16 at OFGC - TiFTuf in 2020 & 2021

The development of TifTuf began in 1992 - the year we constructed Olde Florida! The research on TifTuf was originated by famed turfgrass scientist, Dr. Wayne Hanna. Dr. Hanna has been a good friend to me personally, as well as to the entire turfgrass industry. Dr. Hanna has made several visits to Olde Florida during my 29 year tenure with the club. His successor, Dr. Brian Schwartz also visits Olde Florida several times a year to evaluate current turfgrass varietal testing. 


Dr. Wayne Hanna (left) Dr. Brian Schwartz (right)

Dr. Hanna (and Dr. Schwartz) have already received recognition on TifTuf, their latest release and our new playing surface. This link will take you to the story on the recognition that Dr. Hanna and Dr. Schwartz's received on TifTuf: "General Assembly Recognizes UGA's TifTuf Bermudagrass".


Prior to TifTuf, Dr. Hanna is most known in the industry for his releases of  TifEagle and TifGrand. TifEagle is the turfgrass variety we've had on our greens at Olde Florida since 2000 and TifGrand is the turfgrass we have had on our collars since 2013.  My relationship with Dr. Hanna and the Tifton turfgrass breeding program dates back to the mid 90's when I performed testing at Olde Florida for Dr. Hanna on an experimental grass known as TW-72, which was released in 1997 and subsequently named TifEagle. 


The Tifton breeding program pride themselves on extensive testing. Since 1992, field testing on TifTuf was conducted in Georgia, Oklahoma, Texas, North Carolina and Florida, and after almost 25 years of testing and development TifTuf was jointly released in 2016 by the University of Georgia and the USDA Agricultural Research Service. No other bermudagrass released from the Tifton breeding program has had more data to support its agronomic qualities. This is a link to the: "History of the Turfgrass Breeding Program in Tifton".


TifTuf has numerous qualities that make it a sustainable surface for tees, approaches, fairways and roughs. Key agronomic benefits include:

  • Drought Tolerance – TifTuf has exhibited superior drought tolerance compared to older bermudagrass varieties. TifTuf uses less water and stays green longer without irrigation because of its unique physiological characteristics. During testing, it was determined that TifTuf used 38% less water and retained 95% more green leaf tissue during drought stress when compared to TifWay 419. 
  • Leaf Texture and Color – TifTuf has a very fine leaf texture and a vibrant green color. Visually, TifTuf blends well into areas with other hybrid bermudagrasses. 
  • Wear Tolerance –  TifTuf has exhibited very good wear tolerance. This is one reason TifTuf was chosen for use on the University of Florida football field in Gainesville.                To read about the TifTuf installation at Ben Hill Griffin Stadium you can click this link:  TifTuf at the Swamp: Laying the Foundation for Excellence.
  • Cold Tolerance – TifTuf has excellent cold tolerance in comparison to other bermudagrass varieties. TifTuf stays green longer into the fall, often greens up faster in the spring and seems to have a longer growing season than other bermudagrass varieties.
  • Shade Tolerance – TifTuf has very good shade tolerance, surviving with only 25 percent sunlight transmission during testing.
For detailed information on TifTuf by Dr. Brian Schwartz, Turfgrass Breeder at The University Georgia you can click on this link to watch a YouTube video:  "TifTuf Certified Bermudagrass".

Holes 6, 4, 7, 3, 2, 8 and 10 - 6/12/21 

Wednesday, May 26, 2021

2021 Renovation Update #2 - Bunker Renovation

It has been a very productive two weeks since my last update, and although the region is in desperate need of rain, the weather has been phenomenal for the construction aspect of the Olde Florida renovation! I am pleased to report that the project is on schedule and almost everything is going exactly as planned. 


In this update I am going to focus on one component of the project, the bunker renovation. A significant aspect of the project is the renovation of the 89 bunkers, which account for 3.27 acres on the golf course. Just shy of 20% of the total cost of the project will go towards the bunker renovation. 


The bunkers at Olde Florida have never been renovated. In the last 29 years we have replaced all of the sand once, but the construction is original. Although the bunkers have played exceptionally well, it was decided to do a complete renovation of the bunkers this summer for two reasons. 


First, a significant number of bunkers have lost the Rees Jones design features that were in place when the course opened in 1993. A second, and much more significant reason for the renovation is because of the bunker construction method. Since we built the bunkers almost three decades ago several new construction methods and liners have been developed that significantly reduce maintenance and improve playability. In particular, the bunker sand washing that routinely occurs after heavy rains is almost eliminated with these new construction methods and materials.   

Left Greenside Bunker on #4 Prior to Renovation - 3/12/21
Left Greenside Bunker on #4 - 5/14/21
Greenside Bunker on #4 - 5/26/21

Over the last 10 years I have evaluated and performed on site testing of several bunker liners/construction methods. After significant consideration and analyzation of the aspects of each, the Better Billy Bunker Method was selected. The key component to this construction method is the polymer-coated gravel liner in the floor of the bunker which allows water to pass through at a rate that exceeds 1500 inches per hour. When water is properly diverted around bunkers, even during extremely heavy rain events the bunker sand hardly moves.


Bunker washout is a substantial issue for most golf courses and certainly at Olde Florida. Washouts contaminate sand and require staff to spend countless hours repairing bunkers after major rain events. After a heavy rain it’s not uncommon for us to assign as many as 16 employees, each spending 8-12 hours pumping water, removing silt and shoveling sand to repair bunkers. By installing the Better Billy Bunker Method we will almost eliminate washouts allowing us to reallocate a significant amount of labor to other tasks.  

 

Developed in 2009, the Better Billy Bunker Method has been installed on over 1,200 golf courses worldwide. In the YouTube video here and below are testimonials on the method from Golf Course Superintendent’s at; The Country Club of Castle Pines, The Loxahatchee Club, St. George’s Golf and Country Club, Winged Foot Golf Club, The Robert Trent Jones Golf and Country Club and others. 




Each facilities needs/desires, time frame and budget for a bunker renovation can be different. Therefore, the renovation process to the Better Billy Bunker Method can be slightly different. 

Below is an explanation of the project at Olde Florida. 


During our club closure in March (16th & 17th) Greg Muirhead, Senior Vice President / Senior Designer with Rees Jones, Inc., was onsite to define the features that have been lost. Greg and I were both on site in 1992 during construction, so in addition to the photographs I have from the early days, we both have first hand knowledge of the original shape of the bunkers.  As Greg painted the outlines of each bunker on March 17th I took photos. The photos from that day are now being used to mark the edges for our construction/renovation. 
Greg Muirhead Marking Right Greenside Bunker Hole 4 - 3/16/21
Right Greenside Bunker Hole 4 - 3/16/21
The physical aspect of the bunker renovation process at Olde Florida began with the removal of the existing bunker sand. The removed sand was stockpiled for later use as topdressing in historic wet areas. With the sand removed, the original drainage pipe and limestone gravel was removed from each bunker. Our original thought was we might try to reuse this pipe, but after inspection of the pipe it was determined new pipe would be the safer and wiser choice. After pipe and gravel removal, two crews from Leibold Construction began shaping the floor of the bunkers and moving soil to areas that needed features reestablished.

Sand Removal Greenside Bunker - Hole 4

Existing Drainage Pipe and Limestone Gravel Removal - Hole 7 
Existing Drainage Pipe and Limestone Gravel Removal - Hole 7 

Bunker Shaping - Hole 5
Adding Soil to Reestablish Bunker Features - Hole 3

The floor in each bunker is being shaped to increase the slope and subsequent rate of water infiltration into the drainage pipes. When the floor is shaped to the proper slope and 10" depth (explanation below), drainage is installed. The elevation and slope of each drain line is carefully inspected prior to new pipe and granite gravel being placed in the drainage trenches. 


When drain pipe and gravel installation is complete an exact 3" layer of granite gravel is installed in the entire floor of each bunker and the Better Billy Bunker patented polymer is sprayed to a depth of 3/4". This secures the gavel in place. The gravel layer acts as both a liner between the subgrade and the bunker sand as well as a conduit for water to enter the drain pipe. 


The final step is the installation of 7" of new, angular bunker sand. As was previously mentioned, since the gravel is an exact 3" depth and the sand is an exact 7" depth, the floor of the bunkers are carefully constructed to an exact 10" depth from the floor to the new grass line. The gravel slope/contour matches the sand slope/contour exactly.   


Adding New Drainage and Granite Gravel - Hole 3
Drainage Left Greenside Bunker - Hole 4

Adding 3" of Granite Gravel on the Bunker Floor - Hole 3
Spraying Polymer to Secure Granite Gravel - Hole 4
Gravel Secured with Polymer and New TifTuf Being Installed - 5/26/21 
Gravel Secured with Polymer and New TifTuf Being Installed - 5/25/21
Bunker Sand Installation on Hole 3 - 5/26/21

Greg Muirhead returned to Olde Florida this week to inspect the completed bunkers on holes 3-8 and he was extremely pleased. 

Note: The first 6 holes to be grassed are 3-8, which is why bunker construction was completed on these holes first.
(L-R) Andy Polzin, Assistant Golf Course Superintendent, Greg Muirhead and Darren J. Davis, CGCS Hole 3 - 5/25/21

 

Monday, May 3, 2021

2021 Renovation Update #1

It's been only two weeks since the golf course was closed for play, but the progress on the renovation has been tremendous!!! 

The day after closing a cold front stalled on top of Southwest Florida. The chance for rain and a fair amount of wind delayed our second herbicide application for three days. Although it altered our schedule, it was actually a positive since it provided additional time for bermudagrass regrowth! 

My staff was able to complete the second herbicide application Thursday and Friday 4/22 and 4/23.

Second Hebicide Application on Hole 1 - 4/22
Bermudagrass Regrowth Prior to Second Herbicide Application  

During the second closed week we had three contractors on site each working on separate aspects of the project. Our main contractor, Leibold Construction is currently working on the bunker renovation. 

The first step in the bunker renovation is the removal of existing sand. After the first week the sand was removed from holes 1-10 and some of the bunkers on holes 11 and 18. We are anticipating the sand from all 148,655 square feet of our bunkers will be removed by the end of day on Wednesday 5/5. Leibold will then begin reshaping the bunkers incorporating some the original features that have been lost and begin the installation of the Better Billy Bunker system. 

I will provide more information on the Better Billy Bunker system in a future/separate blog entry 

Sand Removal 4 Green

Below is a video of sand removal on 4 green:

The contractor that performs our Drill and Fill aerification on the greens was also on site for the first three days of the second week. You may recall that last summer we did a single Drill and Fill aerification. This is a link to a blog entry I previously published on extending the performance of putting greens 

This summer, with the golf course being closed and the subsurface in need of continued modification to maintain the functionality of the USGA greens, we performed a "double". The "double" tightened the area impacted from 6" by 7" to 3" by 7". The holes are 1" in diameter and drilled to a depth of 10". Each hole was completly filled in the process with a total of 149 tons of dried, bagged sand.   

Drill and Fill on Hole 14 - 4/28
Drill and Fill on Hole 15 - 4/28


Below is a video of the Drill and Fill aerification process on our practice green:


Solitude Lake Management also had a productive week starting the installation of the Sox Erosion System around the greens complexes on holes 1 and 5. The Sox product is a bioengineered control system that halts shoreline erosion. 

In the 29 years since being constructed we have experienced a significant amount of erosion in these two areas. This process will restore the original slope and the product will prevent the areas from any future erosion. Once complete, sod is placed on top of the fabric. 

I will provide more information on the Sox system in a future/separate blog entry. 

Hole 5 - 5/1/21

The third contractor on site was Aeration Technology. They are performing a process known as fraise mowing. Seven days after the second herbicide application we began the fraise mowing. The fraise mowing is removing 1" of material, which not only removes the dead material, it also exposes rhizomes (below ground growing parts) that are still living. 


The additional sunlight and oxygen that the living plant material (rhizome) will now be exposed to will allow for increased bermudagrass regrowth prior to the third herbicide application. 

Fraise Mowing on Hole 7 - 4/29

A Living Rhizome Exposed 1" Deep After Fraise Mowing - Hole 7

Below is a video of the fraise mowing on hole 8:


My staff who were not involved in the loading of sand into the Drill and Fill machinery were doing our annual, or biennial (depending on the area) trimming of palms and oak trees. This will continue throughout the summer as time permits.

Trimming Palms and Oaks Hole 1/10 

Finally, my staff began the eradication of all "off-type" grass in the TifEagle greens. With the golf course closed for play this summer it was a perfect time to remove the small amount of invasive turfgrass.  After a week without mowing the areas could be clearly identified by their more aggressive growth habit.  

We carefully applied a non-selective herbicide to the small spots. In 30 days the areas will be retreated and a few weeks later will be plugged with TifEagle from our nursery green. The total area affected on the greens is less than 1%.

Marking Off-Type to be Eradicated on Hole 13
Marking Off-Type to be Eradicated on Hole 13


Saturday, April 3, 2021

Growing Grass .... to Kill It

A number of people have asked, “Why is the golf course being fertilized and irrigated when we are trying to kill it?” 


Similarly, some have said, “Why can’t we drive golf carts wherever we want, it’s dead anyway.”


The easy answer is, “It is not dead, and we are doing everything we can to try and make the turfgrass grow! Yes, growing grass to kill it.


Regardless of the amount of herbicide applied in a single spraying, one application will not kill bermudagrass. Re-growth is essential between the multiple applications. Spraying “brown”, non-actively growing bermudagrass with a herbicide is of no value. 


To make turfgrass grow a plant needs four things. The correct amount of: 


1. Water

2. Nutrients

3. Air 

4. Sunlight 


Water      We are providing the plant with water through irrigation. 


Nutrients     We are providing the plant nutrients by fertilizing with granular and liquid fertilizer. 


Air              Turfgrass needs air in the soil. This is why we are asking that you obey traffic control devices. Concentrated traffic reduces turfgrass growth in two ways - wear above ground and soil compaction below the surface. 


In laymen terms, compaction presses soil particles together eliminating air and water space. Compaction reduces the plants ability to maintain and create roots, which are needed for growth. 


Sunlight     We stopped filling divots after the first herbicide application on March 16th so the plant can have full access to sunlight.


This is also why we are mowing continuously in multiple directions. We are removing dead/brown leaf tissue to provide green leaf tissue better access to sunlight.  


So to reiterate, our bermudagras is NOT dead yet. We are doing everything we can to try and make the turfgrass grow so that we can kill it to the best of our ability with the two additional herbicide applications on April 19 and May 21. 


I am happy to report we are doing GREAT and we are seeing terrific re-growth! 


Although we will be closed for golf play after the April 19 herbicide application, I can assure you that we will continue to do everything you have read above (as well as compaction relief and vertical mowing) so that after the third application on May 21, we will have the highest level of eradication possible. 



18 Fairway - April 3, 2021




Holes 12-15 - April 2, 2021



Irrigation on Hole 11 to water in and release the applied granular nitrogen. Nitrogen is also being applied in the irrigation water (fertigation). 



Thursday, March 18, 2021

Glyphosate Usage at Olde Florida Golf Club / Part 2

Part 2

Successful Bermudagrass Eradication 


One of the most crucial aspects of the 2021 renovation at Olde Florida is the eradication of the existing turfgrass. If a high level of bermudagrass eradication is not achieved the results of the golf course renovation will be less than desirable


Bermudagrass eradication is extremely challenging due in part to the plants inherent deep rhizomes. A rhizome is a horizontal, underground stem, which puts out lateral shoots and roots at multiple intervals. Rhizomes can remain dormant for long periods of time and eventually allow bermudagrass to regenerate when growing conditions are favorable.




Extensive research has been performed on bermudagrass eradication. I have based the eradication program at Olde Florida on three peer reviewed university studies, which are summarized below. 


The first study was performed by B.J. Johnson, while at the University of Georgia. The results of Dr. Johnson’s research were published in 1988. The data showed that three applications of glyphosate at 2 quarts per acre were needed to achieve acceptable control. His applications were made in May, June and August. 


Dr. Johnson's research also demonstrated that three glyphosate applications, which is a lower than allowable labeled rate, were much more effective than a higher, single or split application. 


The second definitive study was performed by John Boyd at the University of Arkansas in 1998 and 1999 and published in 2000. Dr. Boyd's research confirmed Dr. Johnson's data from a decade earlier. The results again demonstrated that three applications of glyphosate at 2 quarts per acre, to actively growing, non-stressed bermudagrass over the entire summer were necessary to achieve 98% control. 


Dr. Boyd's study also confirmed that repeat split applications were far superior to a single application of the herbicide at the maximum label rate. In fact, Dr. Boyd found that 5 months after a single application at the maximum label rate, the plot had zero percent control, as compared to 98% control on the three application plot at the reduced rate of 2 quarts per acre.  


Finally, in 2001 and 2002 at the University of Florida, West Florida Research Center another study on bermudagrass eradicaton was conducted. The data from this research concluded that three applications of glyphosate tank mixed with an additional herbicide, Fusilade II, four weeks apart achieved 99% control 12 weeks after initial treatment. Dr. Bryan Unruh, Professor and Associate Center Director, University of Florida was one of the researchers in this study. I have consulted with Dr. Unruh on many aspects of the project at Olde Florida. 


The timing between the herbicide applications is also a key component to the bermudagrass eradication process. Re-growth is essential since spraying “brown”, non-actively growing bermudagrass with postemergence herbicides is of no value. An important component of encouraging bermudagrass re-growth is the maintenance of  adequate moisture and nutrient levels in the soil. The Olde Florida agronomy team will be providing irrigation based on the plants need, as well as supplying a food source with light frequent applications of soluble nitrogen throughout the entire eradication process. 


The herbicide applications at Olde Florida are scheduled (weather permitting) for March 16, April 19 and May 21. Grassing the golf course will not begin until mid-June, which will allow for additional spot treatments (after the scheduled three complete applications) if deemed necessary.    


 
Herbicide Application at Olde Florida Golf Club on March 16, 2021


 Herbicide Application at Olde Florida Golf Club on March 16, 2021

 

 Herbicide Application at Olde Florida Golf Club on March 16, 2021



 Herbicide Application (Click here, or above to play video) at Olde Florida Golf Club on March 16, 2021


Thursday, March 11, 2021

Glyphosate Usage at Olde Florida Golf Club / Part 1


Part 1 

Glyphosate Health and Safety 


Glyphosate is the active ingredient found in numerous herbicides including Roundup, one of the products the agronomy team will utilize to eradicate the existing bermudagrass at Olde Florida. Since its introduction in 1974, glyphosate products have become one of the most commonly used herbicides in the U.S. The widespread adoption is the result of glyphosate’s ability to control a broad spectrum of weeds, its extensive economic and environmental benefits and its strong safety profile. 


Glyphosate works by inhibiting an enzyme present in plants that people and animals do not produce. Glyphosate exhibits low toxicity to humans and non-plant wildlife over both short and long-term exposures. In the environment, glyphosate binds tightly to soil, degrades over time and does not accumulate in the food chain.


Glyphosate is among the most extensively tested pesticides on the market. Most recently, in January 2020, the U.S. EPA published its Registration Review Decision on Glyphosate and stated “EPA has thoroughly evaluated potential human health risk associated with exposure to glyphosate and determined that there are no risks to human health from the current registered uses of glyphosate and that glyphosate is not likely to be carcinogenic to humans.”

 

The EPA’s latest decision on glyphosate adds to the overwhelming consensus among leading expert health regulators worldwide for more than 40 years that the products can be used safely, and that glyphosate does not cause cancer. In addition to the U.S. EPA, leading health authorities from around the world continue to conclude that glyphosate-based products are safe when used as directed and that glyphosate does not pose a carcinogenic risk.


As with any pesticide utilized at Olde Florida, the agronomy team will follow all label instructions and safety precautions explicitly when applying the Roundup, and the other products being utilized during the renovation project. The label does specify, "Keep people and pets off treated areas until spray solution has dried."  Therefore, the golf course will remain closed on the day of application. For a complete Roundup label please click here.  


More detailed information on scientific studies associated with glyphosate can be found in the links below: 


US EPA: Releases Risk Assesments for Glyphosate


US FDA: Questions and Answers on Glyphosate


National Pesticide Information Center: Glyphosate Fact Sheet


In addition, for a very thorough and informative YouTube video prepared by the University of Florida on the controversy over the use of Glyphosate please click here:  Glyphosate: Understanding the Controversy